- Mt. Clare Rd. Upgrade
About 19,960 ft. of 8" line will replace AC line from the early 1960's. About 600 ft. of other size line will be replaced and the existing booster station will be upgraded. The project will also install 3 leak detection meters and 4 master meters to help with water loss in the area.
- Capacity/Reserve Upgrade - Lost Creek Tank
A new 762,000 gallon water tank, and new water booster station will be installed for the LCMC system.
The total cost of these projects should be around $2,100,000.
8" water line being laid down Rt. 25
8" water line being laid through ravine behind Clarksburg Country Club
8" Ductile Iron Pipe being laid down Main Street in Mt. Clare
New Booster Station Preperation under way
New Lost Creek Booster Station being put into place
THIS PROJECT IS 99% COMPLETE AS OF 6/1/2010
Footer being poured for the new Water Tank
Floor and Gutters put together on new Water Tank
750,000 Gallon Tank almost complete
Started Disinfection Process January 12, 2010 (Should take 10 to 14 Days)
FINISHED ON 1/30/2010 -- PUT INTO SERVICE 2/1/2010
New Fence being put up to safeguard your water supply
FINISHED ON 9/9/2009
___________________________________________________________________________________________
- none at this time
- Rt. 76 Area
This project consists of 7,625 ft. of force main line, one new lift station, 2,950 ft. of 8" gravity line, 8 manholes and upgrades to an existing lift station. The total cost should be around $1,035,000. This project was necessary to bring that area of the county in compliance with the WV DEP Consent order No. 5147 issued to the Lakeland Improvement Association and conveyed to Greater Harrison County PSD.
The new lift station being delivered and set
Upgrade to Bridgeport's Booster Station to accept the sewage from this area
Started sending sewage to Bridgeport on August 20, 2009 for treatment
PROJECT COMPLETE AS OF FEBRUARY, 2010
- Phase II - CCC, Laurel Park, Locust Heights & Rt. 73 to Marion County
$15,664,000
__________________________________________________________________
- Enterprise area
$ 6,150,000